Search

Lizandro River Mouth Beach

Foz do Lizandro Beach Plan - POOC Alcobaça-Mafra

 

Objectives:

  • Renewal of the beach facilities
  • Global rehabilitation of the natural space, in a perimeter of 20 hectares, comprising the beach, dune system, oceanic cliffs and watercourses
  • In the scope of the Alcobaça-Mafra Coastal Zone Management Plan, Beach Plan 78

 

Selected for the National Tourism Award 2009.

 

Location: Foz do Lizandro, Ericeira

 

Date: 2007-2008

 

Client: Câmara Municipal de Mafra

 

Constructor: AECI – Arquitectura, Construção e Empreendimentos Imobiliários S.A.

 

Area: 20ha

 

Team: Project developed in collaboration with: Concepsys Lda. – Arq. António Pina

Urbanism: Coreplan - Arq. Nuno Raposo

Eng.ª Biofísica: Eng.º Artur Ribeiro, Eng.º Pedro Martinho

Rede de Rega: Eng.º Ant. Magalhães de Carvalho

 

Status: Partially built

 

 

Lizandro
Lizandro
Lizandro
Lizandro
Lizandro
Lizandro
Lizandro